Skip to main content
NEWOur top 12 applications for manufacturers, field proven.Request the Fall 2026 catalog
PR-101No. 05 of 12

Production schedule optimization

Builds tomorrow's run list from the real order book, the real routings, and how long work actually sits at each step, and tells you which jobs are drifting late before the customer does.

Talk it through with us
The live application · in the catalog

The problem

The ERP holds the orders and routings, but the schedule lives in a spreadsheet built from a data dump and rebuilt by one planner every week. Everyone sorts by due date, so a part with five steps and a vendor operation looks the same as a part with three, and the daily standup only looks at what is already late. Parts sit at a work center for days with nobody noticing, and sales promises dates from memory.

Why Structify, not an off-the-shelf tool

Advanced planning (APS) modules want clean routings and a year of implementation, and they replace the planner’s judgment instead of using it. Structify starts from the data you have, learns the real dwell your routings don’t show, and writes back to the ERP you already run only when the planner approves. When the ERP changes, the connector heals itself, which is where the homegrown Excel and Power BI versions break.

Built for
Precision machining; medical devices; high-mix custom manufacturing
Connects to
ERP work orders and routings (Oracle EBS, SAP, ProfitFab, JobBOSS, Epicor, or any ERP) · shop floor confirmations · supplier promise dates · Teams or SMS · floor displays

How it works · Four modules, each can ship on its own

  1. 01

    Order book and dwell

    Reads open orders, routings, and confirmations every morning. Where routings are incomplete, learns actual step and queue times from history and shows them next to the standard.

  2. 02

    Capacity and backlog

    In the catalog
  3. 03

    Run list

    In the catalog
  4. 04

    Watch and alert

    In the catalog

Start here

Live in 45 days.

Which module to ship first, and what we need from you.

In the catalog

The same problem in other industries

  • Labels and printing
  • Structural steel
  • Aerospace MRO

The outcome

Medical device plant · proof of concept
2 weeks
Of scheduling slack found
The full case study is in the catalog.
Only in the catalog

Reference PR-101 when you talk to us.

109 pages, sent to your inbox. Bring it to the first call and we will mark what applies with you.

  • The live application for each of the twelve, with numbered notes on what matters
  • Every module in full, and which one to ship first
  • Where to start: the timeline and exactly what we need from you
  • The case study behind each outcome
  • Applications 07 to 12, in full
  • The application index: 465 use cases across 14 industries
PR-101 · The full spread, with the live application